WE ARE ON OUR WAY
Thank you to everyone who donated or pledged to our campaign. Your continued generosity brings us closer to reaching our financial goal.
47.44% of our $875,000 goal reached!
How to Contribute
We would appreciate it if you would consider making a recurring weekly, monthly, quarterly, or yearly donation via Parish Giving.
Please identify your cash or check donation (on an envelope and on check-memo) as
“Refurbishment & Revitalization”
Please make checks payable to NDDLM
- Place in weekly collections
- Delivered to Parish Office
- Given to a member of the office staff or pastors
- Electronic donations are accepted via Parish Giving.
Contact David DeStefano (ddestefano@notredamedelamer.org) with any questions or to donate.


For Generations to Come
Refurbishment & Revitalize Campaign
Thank you for being a part of Notre Dame de la Mer Catholic Community and for supporting the work of the Church with your time, talent, and treasure. Your presence and your contributions are a true blessing.
We are all blessed to have such beautiful churches and after many wonderful years of worship, prayer, and the sacraments, are now asking for help to address three immediate concerns (identified below). The years have taken a toll on many parts of both our churches, and this campaign is asking for assistance with the most urgent needs to enable Notre Dame de la Mer to continue to provide a comfortable and beautiful environment.
No vision this big comes without a price, but we believe that by praying and working together, we can build something great, not for our glory, but for God’s. If we are to build what is needed to support our growing faith family and do the work of our Church for years to come, we will need everyone in our community to make an additional, significant, financial sacrifice, just as those who have gone before us.
Consider the story of the widow’s mite from Luke 21:1-4. In this parable, Jesus speaks of rich people contributing their gifts to the offertory, followed by a poor widow who gave two small coins. Jesus viewed her contribution as a sacrificial gift because she truly felt the impact in her daily life.
Thank you for your support, your prayers, and for being part of this project and community. It is a blessing to walk beside you.
In the Peace of Christ,
Fr. Cadmus Mazzarella, Pastor
Campaign Update
ST. ANN: Due to the recent Nor'Easter it was discovered both of St. Ann's towers, specifically the domes and windows, contributed to the interior leaks. The estimate to repair is $60,000, and this repair began on Monday November 9th 2026. Because of these leaks a through inspection was completed for the interior frame from the tower to the vestibule ceiling. Due to extensive damage the cosmetic repair of the vestibule ceiling is temporarily on hold while the interior frame is repaired. This repair is estimated at $22,000 and will commence after the tower repair is completed. Shortly after the Nor"easter a ceiling leak was discovered within St. Ann church - second aisle to the right when facing the Sanctuary. This new leak is the result of storm damage to two skylights. The estimate to remove and board up the skylights is $10,000. This will being immediately after the tower/dome repair. There are six large air vents on the roof which also experienced damage - one lost its cover and we had to strap one down with ratchet straps. The estimate for this repair is forthcoming.ASSUMPTION: The boiler and accompanying water tank require immediate replacement and both parts are ordered - an ETA is not established as of November 9, 2026. The estimate has increased to $125,000.These new additional repairs and estimate adjustments have increased our overall financial need to: $872,000.
Campaign Objectives
This $875,000 campaign will build upon the strong legacy of the Notre Dame de la Mer community, so it can continue meeting the needs of parishioners and students for many generations to come. The campaign objectives will elevate our facilities to better align with the dignity and excellence of the spiritual care and formation we provide.

St. Ann
- Roof Replacement
- Phase I: Exterior Roof Replacement – COMPLETED
- Estimate – $190,000
- Actual – $194,200
- Phase Ia: Tower Repair
- Estimate $60,000
- Actual - TBD
- Phase II: Interior Ceiling & Wall Repair – Start Date 9.14.26
- Phase II on hold until Phase Ia is completed.
- Estimate – $70,000
- Actual – $
- Phase I: Exterior Roof Replacement – COMPLETED
- Total St. Ann Estimate: $352,000
- Actual – TBD
- Roof Replacement

Assumption
- Replace HVAC System
- Phase I: Boiler and Water Tank Replacement – $125,000
- Phase II: 20 Ton Split System (Flanking Alter) – $184,400
- Phase III: 15 Ton Split System (Choir Loft) – $170,600
- Retrofit 24 Pendant Lights
- Phase I: Completed – Retrofitted one test light
- Phase II: Retrofit 23 lights – Completed 9.21
- Estimate – $36,000
- Actual – $34,776
- Phase III: Repair of Choir loft Electric – Completed 9.21
- Estimate – $4,000
- Actual – Completed as part of Phase II
- Total Assumption Estimate: $520,000
- Actual – TBA
- Replace HVAC System
